diff options
author | Hauke Mehrtens <hauke@hauke-m.de> | 2021-08-01 18:45:59 +0200 |
---|---|---|
committer | Hauke Mehrtens <hauke@hauke-m.de> | 2021-08-01 18:45:59 +0200 |
commit | 31f2f76cd5d7745e28fae3797d79b746360461f5 (patch) | |
tree | a97887015feec41de89144da4817fe58be390be9 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | ef56c858482d85db6d6394a0786173e6002253d9 (diff) | |
download | upstream-19.07.8.tar.gz upstream-19.07.8.tar.bz2 upstream-19.07.8.zip |
OpenWrt v19.07.8: adjust config defaultsv19.07.8
Signed-off-by: Hauke Mehrtens <hauke@hauke-m.de>
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions