diff options
author | Jonas Gorski <jogo@openwrt.org> | 2015-08-14 13:05:22 +0000 |
---|---|---|
committer | Jonas Gorski <jogo@openwrt.org> | 2015-08-14 13:05:22 +0000 |
commit | 8e69c9f7ef2e1ca40b33a4a33c76b460c1f62861 (patch) | |
tree | 350321a0e1cd4bf2449f960da1422253c73d2cff /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | 4ecae78c1605e48d35f130dbd62b7b3dcb9a0540 (diff) | |
download | upstream-8e69c9f7ef2e1ca40b33a4a33c76b460c1f62861.tar.gz upstream-8e69c9f7ef2e1ca40b33a4a33c76b460c1f62861.tar.bz2 upstream-8e69c9f7ef2e1ca40b33a4a33c76b460c1f62861.zip |
image.mk: store the device name variable
Make the device name accessible for any build commands instead of
forcing targets to define it themselves.
Signed-off-by: Jonas Gorski <jogo@openwrt.org>
SVN-Revision: 46597
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions