diff options
author | Hauke Mehrtens <hauke@hauke-m.de> | 2020-01-06 21:50:22 +0100 |
---|---|---|
committer | Hauke Mehrtens <hauke@hauke-m.de> | 2020-01-06 21:50:22 +0100 |
commit | 8004e3f2c6c27e3ce0ae440198a3f2c3735da492 (patch) | |
tree | e228161b329cdda05bb5e5bd20bd35d1b56ba849 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | d81a8a3e29c466c796e7d2eb4b320ad939fb4273 (diff) | |
download | upstream-18.06.6.tar.gz upstream-18.06.6.tar.bz2 upstream-18.06.6.zip |
OpenWrt v18.06.6: adjust config defaultsv18.06.6
Signed-off-by: Hauke Mehrtens <hauke@hauke-m.de>
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions