diff options
author | Luka Perkov <luka@openwrt.org> | 2015-03-05 23:43:27 +0000 |
---|---|---|
committer | Luka Perkov <luka@openwrt.org> | 2015-03-05 23:43:27 +0000 |
commit | 90fe39fa8ba4c71ed950b4f364f2d70aafb2c04d (patch) | |
tree | 6c53ad6ec43963b295c94224943736f7a102202f /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | def467318ab4261ef41cf3634db15391e5e38fda (diff) | |
download | master-187ad058-90fe39fa8ba4c71ed950b4f364f2d70aafb2c04d.tar.gz master-187ad058-90fe39fa8ba4c71ed950b4f364f2d70aafb2c04d.tar.bz2 master-187ad058-90fe39fa8ba4c71ed950b4f364f2d70aafb2c04d.zip |
kirkwood: drop support for 3.14
Signed-off-by: Luka Perkov <luka@openwrt.org>
git-svn-id: svn://svn.openwrt.org/openwrt/trunk@44610 3c298f89-4303-0410-b956-a3cf2f4a3e73
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions