aboutsummaryrefslogtreecommitdiffstats
path: root/target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch
diff options
context:
space:
mode:
authorJohn Crispin <john@openwrt.org>2015-07-14 07:38:47 +0000
committerJohn Crispin <john@openwrt.org>2015-07-14 07:38:47 +0000
commit1b7379689525ef0ada52035c4461acf7e7e4921c (patch)
tree06496388defd7d539cb6d9b08907e1b227a4ccd2 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch
parenta9b06a49a8fc977f784c1696dc587e9d8db62678 (diff)
downloadupstream-1b7379689525ef0ada52035c4461acf7e7e4921c.tar.gz
upstream-1b7379689525ef0ada52035c4461acf7e7e4921c.tar.bz2
upstream-1b7379689525ef0ada52035c4461acf7e7e4921c.zip
kernel: fix build with CONFIG_MTD unset
Fixed typo in the patch provided by Hauke: https://lists.openwrt.org/pipermail/openwrt-devel/2015-July/034274.html Signed-off-by: Hauke Mehrtens <hauke@hauke-m.de> Signed-off-by: Álvaro Fernández Rojas <noltari@gmail.com> SVN-Revision: 46346
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions